Minimum Monthly Wage (gross and net) | |
USD | |
Net Minimum Wage | 358.32 |
Gross Minimum Wage | 453.62 |
|
63.51 |
|
4.54 |
|
23.82 |
|
34.02 |
|
3.44 |
Total Deduction | 95.30 |
Employer Cost | |
|
453.62 |
|
70.31 |
|
9.07 |
Total Employer Cost | 533.00 |
* Calculation of income tax is [(453.62 – 63.51 – 4.54) x 0.15] – 34.02 = 23.82 ** For single individuals without children and may vary according to marital status and number of children. *** For premiums that are paid in due time, as an incentive, a five-point reduction is applied (down from 20.5% to 15.5%). Source: Ministry of Family, Labor and Social Services Valid for January 1, 2019 – December 31, 2019 USD 1 = TRY 5.64, as of July 1, 2019 |
Cost of Electricity | |||||||
Consumers Purchasing Electricity from Commissioned Supply Companies | |||||||
Distribution System Users
|
Capacity | Active Energy + Distribution |
Reactive Energy
|
||||
Capacity Charge | Over-Capacity Charge | Standard | Daytime | Peak | Nighttime | ||
TRYcent/kWh | TRYcent /kWh | TRYcent /kWh | TRYcent /kWh | TRYcent /kWh | TRYcent/kWh | TRYcent/kWh | |
Medium Voltage | |||||||
Double Term | |||||||
Industry | 306.2555 | 612.5110 | 50.7364 | 51.3217 | 79.3055 | 28.7362 | 26.4716 |
Single Term
|
|||||||
Industry | N/A | N/A | 51.5015 | 52.0870 | 80.0708 | 29.5013 | 26.4716 |
Low Voltage | |||||||
Single Term | |||||||
Industry | N/A | N/A | 57.1785 | 57.7638 | 85.7476 | 35.1782 | 26.4716 |
System Usage Tariffs for Consumers Purchasing Electricity from Private Suppliers* | |||||||
| Capacity | Distribution Tariff | Reactive Energy |
||||
Capacity Charge | Over-Capacity Charge | ||||||
TRYcent/kWh | TRYcent/kWh | TRYcent/kWh | TRYcent/kWh | ||||
Medium Voltage | |||||||
Double Term | |||||||
Industry | 306.2555 | 612.5110 | 8.1106 | 26.4716 | |||
Single Term | |||||||
Industry | N/A | N/A | 8.9588 | 26.4716 | |||
Low Voltage | |||||||
Single Term | |||||||
Industry | N/A | N/A | 13.8612 | 26.4716 | |||
Multiple tariff application for November-March period: 07.00-18.00 daytime; 18.00-22.00 peak; 22.00-07.00 nighttime.
Multiple Tariff application for April-October period: 06.00-17.00 daytime, 17.00-22.00 peak; 22.00-06.00 nighttime.
Capacity Charge: Monthly fixed-fee calculated per kW based on the “contract power” specified in connection contract and charged to double-term consumers connected to distribution system.
Over-Capacity Charge: monthly fee calculated per kW for amount of power exceeding the “contracted power” specified in the connection contract and charged to double-term consumers connected to distribution system.
Double-Term tariff: Tariff class charged for “distribution fee over the amount of active energy flow (kWh) received from the distribution system or given to the distribution system”, plus capacity-charge calculated per kW specified in the connection contract, plus over-capacity charge for the power (in kW) exceeding the “contract power.”
Single-term Tariff: The tariff class charged for distribution fee only through the amount of active energy flow (kWh) received from the distribution system or given to the distribution system.
*The active energy price is not reflected in the table, as the price is determined bilaterally between the consumer and the supplier.
Electricity Bill Calculation:
[(Consumption (kWh) x Active Energy Price* (TRYcent/kWh) x 1,02**) + (Consumption (kWh) x Distribution Tariff (TRYcent/kWh))] x 1.18***
Active Energy Price*: the consumers can either purchase electricity from the commissioned supply companies at the prices indicated in the table or at the prices determined bilaterally with the private electricity suppliers.
**Funds (electricity fund 1%, electricity consumption tax 1%)
***VAT 0.18%
Source: Energy Market Regulatory Authority (EMRA)
USD 1 = TRY 5.64 as of July 1, 2019
|
Cost of Water for Industrial Use | |||||||
Reference Price USD/m3 | |||||||
Type of Customer | Water | Waste Water | Water VAT (%) | ||||
Industry | 2.17 | Included | 8 | ||||
Reference Price USD/m3 | |||||||
Organized Industrial Zones (OIZs)
|
Water | Water VAT (%) |
Waste Water
|
Waste Water VAT (%)
|
|||
Eskişehir OIZ | 0.12 | 8 |
0.12
|
8 | |||
Antalya OIZ | 0.9 | 8 | - | - | |||
Source: Istanbul Water and Sewerage Administration (ISKI) Eskişehir Water and Sewerage Administration & Antalya Water and Sewerage Administration USD 1 = TRY 5.64 as of July 1, 2019 |
Cost of Natural Gas | |||||||
Gas Sales Tariff for Customers that have a Signed a Gas Sales Agreement with BOTAS
|
|||||||
TRY/kWh | TRY/Sm³ | ||||||
Less than 300,000 Sm³ | 0.08364793 | 0.890014 | |||||
OIZ | 0.12638816 | 1.344770 | |||||
More than 300,001 Sm³ | 0.12702321 | 1.351527 | |||||
Gas Bill Calculation: Consumption (Sm³) x (Tariff per Sm³ + 0.023 TRY*+Transport Tariff per Sm³**) x 1.18*** *0.023 TRY/Sm³: Special Consumption Tax **Transport Tariff/System Usage Tariff (see the websites of the relevant gas distribution companies) *** 0.18% VATSource: Petroleum Pipeline Corporation (BOTAS) Excluding SCT and VAT USD 1 = TRY 5.64 as of July 1, 2019 |
Cost of Broadband Services | |
Fibernet and Hypernet | (USD/month) |
Download Speed (Mbps) - unlimited tariffs | Price |
Up to 24 | 51 |
Up to 35 | 60 |
Up to 50 | 75 |
Up to 100 | 104 |
Up to 1000 | 165 |
Metro Ethernet and G.SHDSL | Requirement specific |
Source: TTNET, Superonline All taxes included. USD 1 = TRY 5.64 as of July 1, 2019 | |